Construction on the $284 million New Chester Bridge reached a pivotal milestone with the successful placement of the final piece of the permanent steel floor system across the Mississippi River. The three-tower cable-stayed structure highlights seamless multi-facility synergy across Veritas Steel: our Palatka, FL plant manufactured 54 high-precision steel anchor boxes (645 tons), while our Eau Claire, WI team fabricated 283 heavy floor beams and edge girders (2,313 tons). Working alongside Ames Construction and Tensor Engineering, Veritas Steel is proud to supply the backbone for this vital interstate link between Missouri and Illinois.
