IDOT Bridge
Rockford, IL
Veritas Steel is proud to be part of a new bridge project for the Illinois DOT in Rockford, IL. Veritas fabricated 871.5 tons of steel for this bridge, including:
- 49 plate girders measuring 6’4” deep and up to 104’ long
- 2 large pier cap box beams weighing over 158,000 pounds each.
This project is part of the reconstruction of the I-39 and U.S. 20 interchange which began in July 2023.