Memorial Drive - Veritas Steel
img

Memorial Drive

Green Bay, WI

Memorial Drive

Green Bay, WI

The U.S. Highway 41 Memorial Drive project consisted of three separate trapezoidal tub bridges comprising a total of eight units. The project contained 9,719 tons of steel, requiring 120 tubs to be fabricated and fully painted in our facilities.

The tubs were 7 ft. 2 in. high with a center to center width of 12 ft. 6 in. at the top flanges. All structures were on a horizontal curve.