Palatka - Veritas Steel - Page 2
img

Search

Results for: Palatka

News

Setting the Standard: Final Steel Floor System Erected on the New Chester Bridge

Construction on the $284 million New Chester Bridge reached a pivotal milestone with the successful placement of the final piece of the permanent steel floor system across the Mississippi River. The three-tower cable-stayed structure highlights seamless multi-facility synergy across Veritas Steel: our Palatka, FL plant manufactured 54 high-precision steel anchor boxes (645 tons), while our […]

News

Career Path Highlight: George Ford

Congratulations to George Ford, the focus of this month’s Career Path post. George has worked with Veritas Steel for 18 years. He works in Bay Assembly at our Palatka, FL, facility and won November Employee of the Month due to his positive attitude, work ethic, and dedication. 🌟   When asked what being a Veritas […]

Kentucky Lake Bridge

The Kentucky Lake bridge is 3,611 ft long and has three units: the 1,409-ft-long four-span west approach, the 550-ft-long steel tied-arch main span, and the 1,652-ft-long five-span east approach. Veritas Steel fabricated over 9,800 tons of the approach girders in Palatka Florida and 2,400 tons of the main arch span in Eau Claire, WI.

Broadway Bridge

The new Broadway Bridge connects the community of North Little Rock, Arkansas with downtown Little Rock. The two main span arches each span 440 ft. across the Arkansas River and were fabricated at our Palatka, FL facility. This new structure adds to the vibrancy and resurgence of downtown Little Rock.